Coastal Collectors & Pumping Stations

Construction of South Beirut Coastal Collectors & Pumping Stations [Naame (Damour) – Ghadir]

  • Supply, install and test 7.2 Km of wastewater pressure pipes; Diameter ranging between 500mm and 800mm of GRP pipes.
  • Supply, install and test 12.5 Km of wastewater gravity pipes; Diameters ranging between 200mm and 400mm of UPVC and Concrete Pipes at Khaldeh area.
  • Supply, install and test 18 Km of wastewater gravity pipes; Diameters ranging between 200mm and 900mm of UPVC and Concrete Pipes.
  • Construct, equip and commission Khaldeh (PS0), Naamé (PS1) and Damour (PS2) sewerage pumping stations: concrete buildings, pumps and electromechanical works, transformers and electrical connections with Electricité du Liban (E.D.L.)
  • Construction of 900 manholes and emergency generators.

CATEGORY

Sewerage & Drainage

YEAR

2009

LOCATION

Lebanon

CLIENT

Council for Development & Reconstruction

VALUE

$12.7M

TYPE

Marine Works

Coastal Collectors & Pumping Stations
Coastal Collectors & Pumping Stations